Do not look at the 80 will regret the decoration knowledge quickly come to learn it!


Many netizens complained that the decoration was not satisfactory, so it was not as good as expected. In fact, during the renovation process, there will be more or less regret. Today we have listed 80 pieces of knowledge about decoration and common sense. The friends you use may wish to learn to minimize the regret caused during the renovation process!


TCL Legrand switch

1, do not do the head of the shoe partition, leave a little space so that the gray shoes can leak to the bottom, installed above the sink and gas stove lights. When determining the location of a bathroom floor drain, you must first think about it and measure the size. The floor drain is best located on one side of the brick. If it is in the middle of the brick, the floor drain will not be the lowest point regardless of how the brick is inclined.

2, bathroom, air conditioning socket are not designed switch. Especially bathroom electric water heaters, with a two-stage switch with a plug is appropriate. If you want to turn off the electric heat, it is dangerous to pull the plug

3, on the face of the brick corner of the treatment method, in the final analysis is to see the level of workers. If the masonry workers are in good condition and the tools for grinding tiles are good, they should not hesitate to grind the 45-degree angle. From the effect point of view, as long as the grinding is good, the practice of grinding the angle of 45 degrees is the most beautiful! If the worker's level is really not good, then you still have to choose to use an angle strip, because the bad 45-degree angle grinding method is not as good as the effect of the Yang-angle strip.

4. It is also very important to test the water pressure after the water pipes are arranged. During the test, everyone must be present, and the test time should be at least 30 minutes. The conditions are permissible, preferably one hour. Ten kilograms of pressurization, and finally there is no reduction to pass the test.

5, plastic steel doors must be considered when the size of the plastic steel door frame protruding wall, informed the installation staff, making the final door frame and finished tile wall is flat, so both beautiful and good hygiene.

6, the carpentry door package and the mason's tiling is also to match, when the package door, we must consider the following ground (door on both sides of the ground on either side) whether it is still tile or other cement mortar leveling thing, Because if the door cover is nailed before the tile, it is always wrapped to the ground. In the future when cement is used, if the cement and the door cover are stained, it will cause the door cover wood to absorb water and mold.

7, the mattress and the bed board must be breathable. Bed board is generally best with fir board

8, do paint as much as possible with paper tape

9, buy luminaires should pay attention: generally try to use glass, stainless steel, copper or wood (shelf), generally do not buy what plating on the top of what other plating ah, what paint ah and the like, easy to fade.

10, basins try to use ceramic basins, glass basins are difficult to engage in health

11, hydropower reform to their own plans, asking them to open the line according to Cao. They looked at their lines and pressed Cao's lines. Each item must be checked and accepted.

12, waterproof must be done, we must test the water!

13, many of the construction of the verbal agreement has become a gap in the checkout, must be written in black and white, the increase and decrease of the project must be sure to ask the price, write it out!

14. If the ground is installed on the ground, the ground must be re-doed to re-level the cement layer.

15, the kitchen door, or to decorate the carpenter to do wooden hanging rails as well.

16, the living room as much as possible to install the power plug.

17, outside the bathroom shower or partition. It is not practical to pull a shower curtain. It is practically inconvenient and the water flows across the floor.

18, to do the material of the door and door frame to choose the fine materials of wood.

19, before installing the cabinet must confirm that your home waterway is OK.

20, kitchen and floor tiles must not pick white.

21, the ceiling should pay special attention to wipe the putty before wiping Dulux

22, the number of living room lighting should not be too much, simple as well, otherwise like a lighting shop!

23, buy those things that need to install as much as possible to require the installation of sales, it does not include the installation, we must insist on the completion of the installation before paying the full amount! !

24. During the renovation, bring the business card of the manufacturer that you collected before

25, the protective film of the aluminum buckle plate is best removed before loading.

26, shoe cabinets are best to use shutter doors, deodorant. You can leave a socket on the side of the shoe cabinet to insert and bake shoes.

27, the place where you can cut vegetables can be a small lamp.

28. If it is convenient, the restaurant can also arrange air fans so that when eating hot pots or making barbecues, the ceiling of the hall will not be contaminated.

29, the best arrangements for the entrance of a cabinet to put debris, can be placed on the top of the shoe. It is very convenient to put commonly used things such as umbrellas, bags, scissors, change, drugs, and so on.

30, there is no need to use expensive ceilings, such as not too worried about the problem of moisture and soot, it is recommended to use waterproof gypsum board brush waterproof paint, a guest of my home to do so, very beautiful. If you must use aluminum gussets, it is recommended that:

1, not too expensive.

2, the use of the net color, especially the kitchen ceiling, pure white is very good, and the color and white style unless matched, or it is easy to incoherent.

3, grasp their own ideas, do not believe the eyes of selling smallpox, their vision is really soil.

4, stare at the scene, close the edge is very important, do not let them sloppy, or leave a black seam, how to see how ugly.

31. The third day is mainly to drill holes and continue to put tiles. The exhaust holes of the range hoods and water heaters should be pre-punched. If they are well-sealed, then it will be inconvenient. Therefore, be sure to choose a range hood, stoves and water heaters before the renovation to determine the size of the hole.

32. Considering that the customized cabinets are good-looking, but not durable, after integrating the opinions and experiences of some students on the Internet, the cabinets are made of cement, with ceramic tiles on both inside and outside surfaces, marbles on the countertops, and cabinets and doors. Wood to do it. The cabinets thus made are durable and moisture proof. And spend not much. Many neighbors have said good things. This is not what I blow.

33. After the door covers are made, the plasterer begins to install the plaster lines and the wall ash project. The walls of my home were relatively flat, and 2-3 lanes would be sufficient. When the batch of ash is approved once a batch of ash, then brush the primer, brush after polishing, and finally with ICI brush finish two times, the entire wall looks smooth and smooth, really good. After the wall ceiling project was completed, the woodworking masters began to make wardrobes. The closet is made of 18cm Weiye brand big core board, and then the outer panel is decorated, although there is no furniture store to buy so beautiful, but durable, the quality should be better than to buy. I am not afraid to stand on the cabinet's board. I am afraid I will not be able to buy it. The backboard is also relatively thick and it is very thin to buy.

34, other students must pay attention to the following points when tiling:

1 It is best that you can be on site.

2 Partially imperfect tiles can make workers stick to some invisible positions in the future, such as cabinets, washbasins, mirrors, etc., but also pay attention to tiles, waist tiles, etc. Do not be attached to the above position by workers, or what will you do in the future? Can not see, but also spend money.

3 before the wall tiles and floor tiles are affixed, the immersion time must be sufficient.

4 Be sure to plug the ground drain and prevent it from plugging. My family's floor drain was blocked because of the loss of cement. It took 30 to find the management office to clear and get a lot of small mud blocks.

5 people at the scene, workers will not waste tiles. My family was not at the scene when I was tiling, but later I went to see it and wasted a lot of bricks. It was heartbreaking and my bloody Mi Mi.

35. The length and height of a wall. If a bathroom has four walls, measure the length and height of each wall. Then deduct one more window and door area. Finally calculate the area of ​​the ground. After you have sized it, you can also get a shop selling tiles, and they will help you meet again. Plus 5 percent of the loss on the line.

36, the bedroom's top light is best double-controlled, one by the door, one beside the bed, to save the big winter lying on the bed and turn off the lights.

37, the location of the socket must be considered good, height, interval. Even when I first hit the location of the cassette, I encountered a steel bar. After the box was placed, I found that it was just blocked by the TV cabinet, microwave oven, and desk. I had to move the first two furniture positions high and found that it was not only highly ergonomic, but also it could not be bought. Good stainless steel cabinet feet can only be customized aluminum feet.

38. It is only necessary to install one at a corner of the aisle, that is, bright and effective.

39. When the lamp was installed, the position of the table was not taken into account. Now the lamp is not in the middle of the table.

40, bathroom tiles do not use too prime, one is easy to dirty, and second, a long time too plain!

Experience on the entrance decoration children's room decoration cement paint door price socket decoration design living room wall color living room lamp kitchen door decoration find decoration company okay decoration living room decoration partition decoration style marble dining table stainless steel towel rack white furniture plate type furniture door floor tile glass table glass Dining Tables Kitchen Sliding Door Cabinets Doors Cabinets Doors Doors Doors Cabinets Marble Cabinets Kitchen Wall Tiles Glass Doors Glass Tile Cabinets Marble Tiles Glass Cabinets Floor Cabinets Venetian Doors Fabric Beds Glass Furniture Stainless Steel Cabinets Glass Cabinets Doors Cabinets Doors Kitchen Cabinets Doors Cabinets Doors Bathroom Tiles Toilet Spaces Broken Bathroom Door Bathroom Tile Color Bathroom Wall Tile Bathroom Door Size Bathroom Wash Basin

1 2 Next> Total 2 Page
Page to page
Function assignPage() { var page = $('#page_val').val(); if (/_\d+\.html$/.test(location.href)) { location.href = location.href.replace( /_\d+\.html/, ((page == 1) && 1? '' : '_' + page) + '.html') } else if(/\/\d+\.html$/.test (location.href)) { location.href = location.href.replace(/(\d+)\.html/, ((page == 1) && 1? '$1' :'$1_' + page) + ' .html') } } $(function(){ $('#page_form').submit(function() { assignPage() return false; }) $('#page_btn').click(function(){ assignPage( ); return false; }) }) See full story

Aluminum Coil

Aluminum Coil,Aluminum Square Tubing ,Aluminum Panels,Aluminum Dye

Aluminum Tube & Pipe Co., Ltd. , http://www.nbaluminumplate.com