Contracting package decoration contract sample

Subcontracting materials are now full-package repairs, most young people nowadays will choose full-package repairs, so how much do you know about package materials? Before the renovation, you need to sign the contract you understand? The following Xiaobian brings you all Sample contract for contracting decoration materials , we can choose in reference! Hope to help you.

Contracting package decoration contract sample

Principal (Party A): Address of residence: ID number: Telephone:

Undertaker (Party B): Address of residence: ID number: Telephone:

project:

After friendly negotiation and negotiation between Party A and Party B, Party A decided to entrust Party B with the decoration (decoration) of the bedroom. In order to ensure the smooth progress of the project, according to the relevant laws and regulations of the country, this contract is specially signed for mutual compliance.

Article 1: Project Overview

1. Project address: ________________________________________________

2. Room specifications: ____ Room ____ Hall ____ Kitchen ____ Wei, construction area ____ square meters.

3. Delegate method: Inclusion of materials (except security door, lamps, floor materials fee)

4. The project price (in capital): ________________ Yuan, the project price includes the project materials listed in the third article of the contract, all the labor costs in the decoration process, removal charges, and decoration waste cleaning fees. (Note: All labor costs related to decorating and engineering materials are borne by Party B. If Party B asks for other expenses in the construction project, Party A has the right to refuse to pay. If Party B delays the construction, Party A has the right to terminate the contract and pursue the relevant liability for breach of contract.)

5. Project Commencement Date: ________________ Month_______

6. Project Completion Date: __________________________________________________________________________________________________

Article 2: Construction Content

1. Living room: One shoe, living room, plaster line, ceiling, plastic window, four sockets and two switches.

2. Master bedroom: One closet (with shuttle door) plus wall cabinet, one balcony door (with shuttle door) plus wall cabinet, two bedside tables, plaster line, six sockets and two switches.

3. Second bedroom: a closet (with shuttle door) plus wall cabinet, master bedroom between the second bedroom to do a new wall partition, do plastic bay window, Bay window into a computer desk plus a bookcase, two bedside cabinets, do the plaster line, Install four sockets and two switches.

4. Kitchen: Water transformation, wall tiles, floor tiles, custom-made cabinets, introduction of smoke-free stoves, installation of exhaust fans, safety gates, suspended ceilings (aluminum buckle plate), installation of vegetable basins, mixing valves, chopping board quartz stone, Install six sockets and two switches, waterproof.

5.Bathroom: Reconstructing the water, sticking wall tiles, floor tiles, ceilings (aluminum buckles), safety gates, washstands and cabinets, basin mixing valves, washing machine taps and fittings, floor drain, seated stools (containing water tank) , install two sockets and two switches, waterproof treatment.

6. Specific requirements for installation of strong and weak electricity: All circuits (wires, cable, telephones, and computer network cables) should be run through pipes and wires must be grounded. Power lines must not be connected underground, and they must be connected to the power distribution box (sockets). , within days of customs), socket panel to use five eyes, switch with five eye socket, and another assembly of electric box (air open) six groups.

7. The construction process of the wall: Once again, the paint is applied twice. The latex paint must be in strict accordance with the proportion of water. It should not be added with water. The wall surface treatment should be vertical and horizontal, and the yin and yang angles should be straightened.

8. Custom-made whole cabinets: The special cabinets are commissioned by Party B to make the whole cabinets, and the standard is 750 yuan/straight rice. If the cost standard is exceeded, more parts will be borne by Party A. Special regulations: Behind the entire cabinet must be covered with walls, countertops made of quartz stone, countertops for the pu board.

Article 3: Decoration Engineering Materials

No. Name Brand/Specification Price Remarks

1.xx xx xx xx

2.xx xx xx xx

3.xx xx xx xx

4.xx xx xx xx

1. Party B shall implement the plain price for the materials used in this contract, and it shall be a qualified product produced by the regular manufacturers. The materials provided by Party A shall be used for the interior decoration works stipulated in this contract, and shall not be used for other purposes without the consent of Party A. If Party B uses it for other purposes, Party B shall compensate Party A according to the double price of the misappropriated material.

2. If the materials and equipment provided by Party B do not meet the quality requirements or the specifications are different, they should be prohibited from use. If it has been used, Party B shall be responsible for the losses caused to the project.

3. After the materials are accepted by Party B, Party B shall be responsible for keeping them. Due to improper storage, Party B shall be responsible for compensation.

4. The type, specification, and name of the main materials used by Party B in the project must be approved by Party A.

5. The project price includes material fees. If Party A purchases materials by itself, it shall be deducted from the total amount.

Article 5: Payment Method

Starts to pay ______yuan, pays ______ yuan after acceptance of the water and electricity is completed, and pays ______ yuan after the clay carpentry, wall paint, and paint have passed the acceptance check, pays ______ yuan after the acceptance of the house is handed over, and the balance is paid in the house. Pay later.

Article 6: Other matters

1. Safety issues: Party B shall strictly follow safety construction, and Party B shall be responsible for any safety incidents.

2. This contract is made in two copies, Party A and Party B each hold one, and the two parties shall take effect on the date of signing.

Party A (Owner): Party B (Packer):

Contract date: Contract date:

The above is a sample of contracting materials for contractors and contractors brought to you by Xiaobian. We can refer to the contract drafting above. I hope that I can help everyone. Signing a contract on a decoration is very important. Many details need to be clearly stated in the contract to avoid future problems.

Full package renovation contract

High Temperature And High Pressure Special Valves

Special valve refers to can be applied to a variety of special environment and adapt to a variety of complex conditions of the valve, is a very widely used in the national economic construction and development of a general mechanical products, in energy, chemical, medicine, agriculture, food, military and other industries are playing an extremely important role. With the in-depth promotion of industry 4.0, special valves have also entered a new stage of development, and the technology and market of special valves have also undergone new changes.
Compared with ordinary types of valves, special valves have obvious characteristics such as extremely complex internal flow, special structure, special materials and special uses. As a special valve in many valve types, it is applied to various special environments, can adapt to various complex working conditions, plays a special role and undertakes a particularly complex task. Therefore, special valves are often referred to as the "throat" of industrial pipes. More typical special valves are the main feed water regulator, pressure regulator spray valve, high pressure trap, Tesla valve, pilot Globe Valve, multistage pressure reducing valve, sleeve control valve, heart flap valve and so on. It is self-evident that the technical complexity of special valves is much higher than that of ordinary valves, which belong to high-end valve series both technically and in the market.

High Temperature And High Pressure Special Valves,Special Check Valve,High Pressure Ball Valve With Actuator,High Performance Butterfly Valves

WUXI KVC-VALVE , https://www.kvgatevalve.com