Automatic door installation points

Automatic door installation friendship tips

1. If the automatic door rail is installed on the welded iron dragon skeleton, use the square iron pipe with a wall thickness of 3 mm or more, or other materials with a firmness (or better).

2. When installing the skeleton, please ensure that the overall skeleton is horizontal, vertical, firm and compact. The surface of the installation rail should be smooth and burr-free, and the aluminum alloy rails should be horizontally and vertically installed after installation. Please use horizontal level when installing. .

3. If it is installed on the load-bearing wall or the real attachment, ensure that the aluminum alloy rail is installed horizontally and vertically after installation, and it is firm. Please use a horizontal tube with a good level.

4. The installation of the swaying device should be installed after the door body is installed and adjusted. The swaying device must be installed firmly on the ground and not used for long-term use.

5. If you use the company's frameless automatic door special door clamp, please use the matching screw sleeve and leather pad.

6, the probe installation must ensure stable and not shaking after installation. (There is a certain relationship with the thickness and installation of the gusset. The thickness of the stainless steel sheet and the accuracy of the installation are related to the noise of the automatic door.)

Activated Carbon

Granular Activated Carbon,Wastewater Treatment,Water Filtration

Coal-Based Activated Carbon,Activated Carbon Co., Ltd. , http://www.nbactivatedcarbon.com