Keep in mind that the new house decoration process Raiders less road

New home renovation is indeed a very troublesome thing, assuming you do not have the knowledge of new house decoration process, then it will be busy and will spend more money. With the following Xiaobian look at the new house decoration process Raiders , allowing you to take the wrong road.

New home decoration process Raiders

First, tools in place, ready

Before decorating, you must prepare a few things in your bag. Tape measure (buy 5m, not 3m), calculator, big plate clips (folder list, receipts); In addition, it is best to prepare old towels on the site early (the kind of soft cotton, rubbed with bricks) , plastic bag (wrapped on the pipe interface, can prevent dirt blockage).

Second, arrange properly, ready to start

Before the workers enter the court, it is best to measure the corners of the house in person, take them down, mark them clearly, and be sure not to be lazy. The content of the measurement mainly includes: First, the area involved in the decoration process, in particular, the tiling area, wall paint area, wallpaper area, and floor area; and the clear main wall size. In particular, it is necessary to design the wall size of the furniture later.

Third, the main demolition reform, so that space is more practical

The demolition of the main body is the first one to be put on the project. It mainly includes the demolition of walls, walls, shovels, removal of heat, replacement of steel windows, and so on. After the demolition of the completed garbage, it must be cleared up in time to ensure the cleanliness of the interior, but also to facilitate the construction.

Fourth, hydropower reform, arrangements for the use of each space

Hydroelectric reform, no regrets medicine. A brick on the wall, a ceiling, and then think of adding a socket can be difficult. Therefore, be sure to determine the exact location of switches, lamps, basins, bathtubs, washing machines, etc. Before the hydropower reform, the cabinet designer should come to the door to make the first measurement and help you determine the power and waterway reconstruction plan. As for the water heater, it is also best to send someone to design the location of the power supply and the interface according to the model you have determined.

Fifth, pack up the tubes and wrap up the unsightly pipes

Considering the hygroscopic and hygroscopic environment of the kitchen bathroom, the material of the standpipe must not be wood keel. Everyone must be careful, even if the wooden keel brush anti-corrosion coating does not work. Packing tube with light steel keel, or red brick. Light steel keel provinces, but the most solid and easy to use is the red brick.

Sixth, tiling, the first thing with a solid texture

Before tiling, buy a floor drain. Note that floor drains must be purchased for a dedicated washing machine or shower floor drain, and deodorant functions must be provided. After finishing waterproofing and pulling hair, prepare a tiling. In addition to the normal tiling, the tiles are soaked in water and dried in the shade; the broken tiles are left for cutting, but the overall beauty of the tiling is also emphasized. Simply put, it is the brick on the wall. The width cannot be less than 10 cm.

Seventh, oil workers go into battle, scrub scrub brush

If you do not buy finished products, let the worker master do it. It is worth noting that any carpentry work, even if it is just a mouthwash, must follow this step. The big core board sinks and the veneer is veneered before painting. When mixing oil, there is an irresponsible worker who is lazy to brush oil directly on the big core board. This is absolutely wrong. Don’t believe the nonsense of selling Daxin boards individually. There is no problem with brushing oil directly. Remember, if you brush your oil directly, it will take a long time for it to crack. Now do oil mixing, no brush, but spray. It is best to let workers spray white on the inside of the door and the meter box. We need to remind everyone that if the walls are to be painted, the color must be noticed. The color of the recall must be lighter than that of the color card. It must not be the same as the color card or deeper than it is. Otherwise, you will regret it. Because at least two coats of paint are used to paint the walls, some of them are still three times. The color of the wall will be deeper than the one layer.

Eight, wallpaper, to create a beautiful wall

After the wall paint is brushed, the oil trader will apply nitro-lacquer to the place where the wallpaper is to be applied. The paint can dry after the next day, and then the master can paste the wallpaper. In addition, do not open the window ventilation within 48 hours after the wallpaper has been posted, let it slowly dry. You can also communicate with the master of decoration, and repair the individual spots that have risen.

Nine, install socket panel, kitchen ceiling

Sockets are best bought with a switch function, especially the kitchen, so rice cookers, microwave ovens can avoid plugging and unplugging the power supply, and can be controlled with a switch. First install the water heater and Yuba, after installation, ceiling edge sealing can better half-package water heater, which is more beautiful convergence.

Tenth, install cabinets, beautiful whole kitchen was born

Cabinets are a cooperating project and should be ordered in advance about hoods, stoves and sinks. It is best to send it on the same day and install it together with the cabinet. Negotiating with the cabinet factory in advance, you can bring the artificial stone countertop with the cut off stove and the sink into it.

Eleven, install the finished door, install the hardware

It should be noted that the floor should be installed first to avoid unnecessary damage to the floor during the door installation process. Install drying racks, curtain rods, lamps, sanitary ware, sanitary ware and other hardware. It is also recommended that before the installation of the floor, these dust scattered items to get one by one.

Twelve, install the floor, install the radiator

Before the floor is installed, you must do a leveling. Prepare a little pepper in advance. Do not buy the so-called insecticide powder brought by the floor worker. Let them sprinkle along the kicking corner. At the end of the renovation, it is the easiest to ignore. It must be made clear in advance that if the cover of the installation cover is not the manufacturer's cover, it will not be accepted. Pay attention to the various documents installed on the radiator. The easiest place to go wrong is to install. If you agree with the chapter of the installation team, it basically means that you gave up the right to let the manufacturer responsible. Once there is an accident that has soaked the floor and flooded the home, manufacturers will absolutely shirk their responsibilities and it will be impossible for the installation team to find anyone. The so-called warranty can only be borne by the user.

Thirteen, furniture, home appliances approach

In a new home, furniture bears the brunt. Beds, mattresses, wardrobes, shoe cabinets, sofas, dining tables, etc. Note that before the furniture enters the market, the following items should be prepared: disposable shoe covers (do not buy poor quality, step on the break), a few boxes of activated carbon, ladders, floor protection film. If you buy a fabric bed, remind you to see if the fabric can be taken down.

Fourteen, accessories decoration, home has a taste

The last step in home improvement has been changed from decoration to decoration, including the installation of curtains that belong to the home accessories section. With a decorative ornament and beautiful curtains, the soft taste of the home came out. As for the purchase of curtains, it is best to order furniture to avoid style conflicts. Home accessories also include consideration for buying some green plants, wall paintings, handicrafts and more.

Editor's summary: The information about the Raiders of the new house renovation process is introduced here for everyone, I hope this article will help everyone. If you still have something you don't understand, you can leave a message to Xiaobian at the bottom. We will answer your questions as soon as possible.